| n |
The first and
last phases (Planning and Closure) consist of
|
|
|
defined
processes.
|
|
|
| n |
The Sprint
phase is an empirical process. It is treated as a
|
|
|
black box that
requires external controls.
|
|
|
| n |
Sprints are
nonlinear and flexible. Sprints are used to evolve
|
|
|
the final
product.
|
|
|
| n |
The project is
open to the environment until the Closure
|
|
|
phase. The
deliverable can be changed at any time.
|
|
|
| n |
The
deliverable is determined during the project based on the
|
|
environment.
|
|